
BE READY TO

Troubleshoot without tools.
See voltage/current at a glance and control circuits from the unit.

Wire Faster. Build Smarter.
Push-In Plus + integrated design = less wiring, faster installs.

Isolate the Fault. Keep Running.
Fast electronic cut-off isolates the bad branch—others stay live.
HOW IT WORKS
Previous
- Work on CPs and wiring positions one by one. Cut the CP of the system and then resume it.
- Measure the current of all systems with a tester.

With S8AS2
- With the button (C) on the front, cut the CP of the system and then resume it.
- With the display (A) and the button (B) on the front, check the currents of the system and all systems.

Previous
- Facility conditions are monitored by checking the power supply’s current and voltage with a tester.
- Readings are recorded before work, and again before and after maintenance.
- Output voltage is routinely measured using a tester as part of regular checks.

With S8AS2
- Voltage and current can be checked directly on the S8AS2 display—no tester needed.
- Quick visual confirmation supports faster checks during routine work and maintenance.
- The S8AS2 display also indicates replacement timing for easy lifecycle monitoring without tools.

BEST-FIT USE CASES
Previous
- Power Supply (480 W) + Mechanical CP + Terminal block.
- One Power Supply, eight CPs, and ten terminal blocks are installed in a control panel, and wiring is necessary on the load side and between the devices.
- Wiring and short-circuit bars are required between devices.

With S8AS2
- S8AS2 is installed in a control panel, and wiring is done on the load side. No wiring is necessary between devices.
- Integrated design eliminates the need for wiring between devices.
- Installation and wiring work: Approximately 1/10 (*Based on our survey.)

BUY NOW